Ashburton & Christchurch
Christchurch Southern Motorway
Central Plains Water Stage 2
Transporter - Heavy plant haulage for CPW S2 and the CSM
Waimate & Oamaru
McSkimming water storage pond, Ranfurly
Effluent pond construction and pivot conversion for Geoff Hay
New bridge for Gary Rooney
Fishing boat salvage at Oamaru Harbour
Re-armouring Pukaki Canal for Meridian Energy Limited
Flood damage repairs for MGI Irrigation Limited
REL Drone Land Mapping and Aerial Photography
Ecotech Limited
HDPE pond lining for MGI Irrigation Limited
Timaru
Waste Management Oamaru siteworks for Thompsons
Springs Road Subdivision for Cliff Eggeling
Christchurch
Preston's Road drainage siteworks for Foodstuffs S.I.
New Depot siteworks in Dakota Park for Mainfreight
New Site development for Z Energy & Burger King
New Nova Gas Storage facility and Drainage crew contracts
Crossbank Stopbank realignment for Environment Canterbury
Clare Park development for the Christchurch City Council
Ngā Puna Wai Sports Hub project for Christchurch City Council
REL Workshops
Ashburton Workshops repair and maintenance of REL plant
Rooney Earthmoving Magazine Issue 10
Newsletter - December 2016 (.pdf)
Special Projects
Waihao Downs Irrigation
Timaru
Hunter Hills Subdivision - Springs Road
Ecotech Limited
GRP Pipe Bend Fabrication and Cold Welding
MAF Inspection of Pipe and Transport Logistics
Timaru
Primeport Timaru Spur Wall Extension
Ashburton
Inland Port Fertiliser Importation and Storage
Underpass Install for Mark Morrow
Preston's Road Siteworks for Foodstuffs (S.I.)
Ashburton & Christchurch
Ullrich Aluminium Siteworks and KiwiRail Fibre Install
Timaru
Frasers Road Hard Rock Quarry
Inland Port PKE Screening and Storage
ECan Waimakariri Flood Protection - Handloaders Contract
New Weighbridge for Inland Port
Waimate & Oamaru
Joy Burke Dairy Conversion, Ikawai
Waimate Event Centre
Brosnahan Farm Development, Beaconsfield
TDC Little Pareora HDPE Pipeline Installation
Kevin and James Cromie Centre Pivot Re-Contouring
Waitangi Station Farm Maintenance and Irrigation
Rangitata South HDPE Race Lining
Clearing Forestry Reserves for the Waimate District Council
Lake Pukaki Gravel Removal for Meridian Energy
REL Workshops
Timaru Workshops Repair and Maintenance of REL Plant
Rooney Earthmoving Magazine
June - 2014 - web (.pdf)
Inside this issue:
Special Projects
- Waihao Downs Irrigation Scheme
- RSIS Fish Spawning Race
- RSIS Landscaping and Farm Clearing
- MHIL Carew Ponds
Ashburton
- Klondyke Dairies Water Race
Waimate & Oamaru
- Dairy Conversion for Barry & Kieron Henshaw
- Property Conversion for Bog Roy Station
- Rock Groynes in the Waitaki River for NZTA
- Rock Armouring for Meridian Energy
- Terrace Clearing for Jim Waldie
- Covered Dairy Feedlot for Craig Wilton
- Bridge Design and Installation for the van Leeuwen Group
Ashburton
- Barrhill Chertsey Irrigation GRP Pipeline
Timaru
- Meadows Road Overlay
- Pylon Access Tracks for Transfield Services
- Hunter Hills Subdivision
Rooney Earthmoving Magazine
Dec- 2015 - web (.pdf)
Inside this issue:
About The Rooney Group
REL Special Projects
Waihao Downs Irrigation Scheme
Rangitata South Irrigation Schemes completed ponds
MHIL Carew Ponds completed
REL Timaru
Primeport Timaru Gravel Stockpiling
Zealyn Siteworks for Thompson Engineering Ltd
REL Ashburton
Barrhill Chertsey Irrigation GRP Pipeline
REL Christchurch
Viking Christchurch Siteworks
REL Waimate & Oamaru
Property re-contouring for Pete and Donald Mehrtens
Terrace re-contouring for Ali Bell
Dairy Farm Revamp and Underpass Installation for Geoff Hay
Rooney Earthmoving
Excavator mounted 34 Auger and Multigrab bucket
Ecotech Limited
Pond Design, Construction and Lining for Clifton Downs
Pond construction and Lining for Ron Smith at Fairlie
Rooney Earthmoving Magazine
Oct - 2014 - web (.pdf)
In this issue, find out about the specialised staff and equipment Rooney Earthmoving are employing and the vast scales involved when installing HDPE liner, Ecotech Geotextile and Agrimat tiles in a wide range of Mid-South Canterbury and North Otago irrigation and diary projects.
Featured are the Rangitata South Irrigation Scheme, MHIS Carew ponds, Waimakariri Irrigation Scheme upgrade and MGI Irrigation Ltd storage pond.
Also read about recent dairy related projects including the construction of platforms, lanes and ramps, re-contouring of terraces; installation of a state highway underpass, foundations for effluent ponds, shed platforms, building foundations and kerbing. Featured in these projects are: Morgan and Hayley Easton, Nigel & Jane Reith and Barry Mathews Dairy Conversions; Alan & Leigh Gibson dairy maintenance; SH82 underpass for Joy Burke; and an effluent tank for the Van Leeuwen Group.
The Hunter Hills subdivision and a warehouse for Foodstuffs NZ South Island are also reported on.





Magazine